This was one of the most challenging jobs Hawkins has undertaken, the detailing and fabrication was extremely complex.
All fabrication was undertaken in-house to comply with BS EN 1090-2 to Execution Class 2. The inner ring of steel was trial erected to ensure that all angles and the radius were 100% accurate and the structure would bolt together and form the circular design.
The project was a complete success and fitted 100% first time around. All steel work was erected by our own steel erectors and completed 1 week ahead of schedule.
Location: Hitchin, Hertfordshire